Skip to content

Use the calendar views

Switch Tasks to Calendar with the toggle at the top-right. Every contact’s page also has a Calendar tab showing just that person’s items (week view).

The calendar shows your tasks, calls, and meetings. Logged items — notes, email, LinkedIn messages — never appear. Filter by type with the Tasks / Calls / Meetings chips; move with Prev / Today / Next and switch spans with month / week / day. The view, date, and span are in the URL.

Seven columns, up to four chips per day, then +N more (the popover loads the full day). Click a day number to jump to that day.

Two rails above a scrollable 24-hour grid that opens on business hours: an all-day rail, and beneath it a tasks rail. Overlapping timed items split into side-by-side columns; a red line marks the current time on today.

Tasks never sit on the hour grid. A task is due by a date, not at a time, so it lives on its own rail whatever time is stored on it, and no task chip prints a time anywhere. Calls and meetings keep their times. The task rail shows four per day and scrolls (with a visible scrollbar, so “4 of 10” never reads as “that’s all”), and it appears on every day, including empty ones, because you can drop onto it.

Drag a chip to another day (month) or to another hour slot or day column (week / day, snapping to 15 minutes). The change applies immediately and rolls back if the server refuses. Completed items do not drag. A task dropped anywhere — even on the hour grid — only changes its date; its stored time is left alone.

  • On a chip → Edit and Delete (Delete confirms; Admins). Marking done and snoozing stay on the Tasks list, which is built for triage.
  • On empty space in a day → New activity here (the Schedule dialog with Meeting preselected and the date filled — in day view, the clicked time slot too) and Open day. Hovering a day cell also reveals a + in its corner, and a plain click on empty space in day view creates there.

Right-clicking never starts a drag, so the menu and dragging do not fight.

External calendar events are not imported into this calendar; they overlay the Schedule dialog’s sidebar only. See Two-way calendar sync.